If you’ve been to visit our reindeer on the hill at Cairngorm, it’s likely that you’ve walked over Utsi Bridge. Named after the charismatic Sami, Mikel Utsi, who was responsible (along with his wife Ethel Lindgren) for reintroducing the reindeer to Scotland, this bridge gives access over the Allt Mor river to the Chalamain Gap, and – more importantly for us – our hill enclosure.
The first incarnation was replaced in 1979 by the Edinburgh and Heriot Watt Universities Officer Training Corps, as a summer engineering project, but after 41 years and being crossed by thousands upon thousands of feet (and hooves), it had reached the end of its safe working life and was due to be replaced. However, as it was the only crossing point for some distance, the new bridge would have to be built first, before the old one was removed. Anyone who has been here will also appreciate how difficult the location was for a major build too – there was no chance of getting a digger down into the valley for example – and as it is in a sensitive area other considerations were also necessary. All of the new materials had to be airlifted in, and the old bridge airlifted out, and this had to be done outside of capercaillie breeding season, to prevent disturbance.
Work began in October 2020, and the work crew from ACT Heritage did a fantastic job, working through rain, sleet, hail, high winds and snow. Not to mention the extra complications of an ongoing pandemic! It was also nice that the crew included Ross, the fiancé of ex-herder Ali. They were very good with us, and would always stop work to give us space when we were leading reindeer across the old bridge. Though the orange safety netting was definitely an entertaining obstacle when leading antlered animals! The second national lockdown from Christmas brought work to a halt for a while, but in March a helicopter lifted out the old bridge, and our twin bridges were down to one sturdy, hopefully long-lasting, shiny new bridge.
Not wanting to lose a piece of the Reindeer Company history, Alan drove a tractor and trailer all the way from our hill farm to collect the old dismantled bridge. Apparently the old steel girders were of a quality that is impossible to buy these days! There is a plan to reinstate the old bridge at a suitable location at the farm.
It has taken the reindeer a bit of time to get used to the new crossing – the steps were perhaps not quite designed for reindeer strides – but once they’ve been over it once or twice they get the hang of it. It’s great having the edging alongside the steps to guide them in the right direction – the old bridge was rather awkward as the steps didn’t have a rail on each side, so calves would sometimes “miss”! And with the new ample width, we’re still debating if we can be bothered carrying one of our Christmas sleighs down the narrow path to get a photo of a full team of reindeer in sleigh on the bridge – it would fit!
Andi