The Bridge over the Allt Mor

Funny story…. For months Hen’s been meaning to write a blog about the new bridge en route to our hill enclosure, but eventually this autumn found herself too short of time and suggested to Andi that she wrote it instead, hence Andi’s recent blog. And then, displaying a woeful level of forgetfulness, Hen found the blog that SHE WROTE HERSELF, and had NO memory of writing…Wow. So, you might as well read this one too.

I often talk to people who came to visit years ago but can’t remember much about their walk to the reindeer herd in the hill enclosure, other than the fact ‘there was a big bridge’ over a river. Ah, we say knowingly, you mean Utsi bridge. It’s become an iconic part of our most common route on to the mountains to see the reindeer herd. (But it’s not the sole route we use, so if you read on and have no memory of a bridge, then you aren’t going mad – we probably just took you to meet the herd in a different location!)

Utsi’s bridge as it has been for many, many years.

The original Utsi bridge over the Allt Mor (the river which leads down to Loch Morlich) was built in the 60s, and consisted of not much more than telegraph poles with some planks on them, or at least that’s what it looks like in the photos I’ve seen that remain of it.

The very first bridge was a bit more ‘rustic’!

Bridge mark II was built in 1979 by the Army, and it’s this one, with it’s high-sided handrails, that is the one that most people will remember. I can’t imagine how many times I’ve crossed it, but being as between late April and early January it’s rare for a working day to pass without doing so at least twice (i.e. once in each direction), and often a lot more – it’s certainly a lot of times. I think my record was 9 or 10 trips up to the hill enclosure once whilst shuttling boardwalking material up there. I cursed the lack of vehicle access that day!

Many reindeer hooves have crossed the bridge over the years too. Obviously reindeer can, and do, cross the river directly a lot of the time, but the free-ranging herd will cross the bridge instead at times if making their way towards the enclosure of their own accord. Tell-tale droppings on the bridge give away their route!

Fiona, Sofia and Alan leading reindeer up to the hill enclosure in spring many years ago.

We lead reindeer to and from the enclosure over the bridge, and the most eventful time is always their very first time, usually at around 5 months old, learning to walk on a halter. Actually the bridge itself is no issue at this point – it’s getting on the bridge which can be really hard as there are steps up on to it.

After over 40 years, the second incarnation of Utsi bridge was starting to show signs of wear and tear, the central support starting to get more undermined each time the river was in spate, and eventually it became obvious that it needed to be replaced. We don’t own the land that the bridge is built on so this didn’t come down to us thankfully, although we did attend meetings with regards to how it would happen, and made sure that the plan was definitely to complete the new bridge fully before the old one was removed!

The new bridge under construction, already dwarfing the older one!

Work began in November 2020, but ground to a juddering halt with the second lockdown after Christmas, and even though construction was permitted to continue, the impassable road and deep snow conditions of January and February 2021 made any progress an impossibility. It was mid-April before the bridge was finally completed, just before we re-opened to the public in late April, so all of our visitors in 2021 have walked to the reindeer herd via Utsi bridge mark III. This version is quite considerably bigger, and makes quite a landmark, but I’m not yet as fond of it as I was the old one.

Tilly and Sherlock crossing the new bridge – with a bit more space for large antlers than the previous one!

We all kept pieces of the old bridge, so I have two of the uprights which once supported the handrails in my workshop at home. Maybe one day I’ll use them for gateposts somewhere! Alan and Tilly (owners of the reindeer herd) kept the four 30’ long steel girders that stretched the 60’ span of the river, which had to be helicoptered out from the site to the nearby car-park, and then collected via tractor and (large!) trailer! No doubt they will one day become part of one of Alan’s many sheds.

An old photo of Tilly on the second bridge when it was quite young, showing off the massive steel girders quite nicely!

So if you are visiting us, particularly in the summer and autumn months, have your camera ready for this iconic bridge in case you happen to be lucky enough to cross it en route to the reindeer herd. You’ll be following in the footprints of thousands of visitors, hundreds of reindeer and dozens of reindeer herders, spanning nearly 7 decades.

Hen

Utsi Bridge

Constuction ahead! (or a man with an umbrella, as Olly said!)

If you’ve been to visit our reindeer on the hill at Cairngorm, it’s likely that you’ve walked over Utsi Bridge. Named after the charismatic Sami, Mikel Utsi, who was responsible (along with his wife Ethel Lindgren) for reintroducing the reindeer to Scotland, this bridge gives access over the Allt Mor river to the Chalamain Gap, and – more importantly for us – our hill enclosure.

The second incarnation of Utsi Bridge, which we’ve been using for the past 42 years.

The first incarnation was replaced in 1979 by the Edinburgh and Heriot Watt Universities Officer Training Corps, as a summer engineering project, but after 41 years and being crossed by thousands upon thousands of feet (and hooves), it had reached the end of its safe working life and was due to be replaced. However, as it was the only crossing point for some distance, the new bridge would have to be built first, before the old one was removed. Anyone who has been here will also appreciate how difficult the location was for a major build too – there was no chance of getting a digger down into the valley for example – and as it is in a sensitive area other considerations were also necessary. All of the new materials had to be airlifted in, and the old bridge airlifted out, and this had to be done outside of capercaillie breeding season, to prevent disturbance.

Piles of materials for the new bridge after they were dropped off by the helicopter.

Work began in October 2020, and the work crew from ACT Heritage did a fantastic job, working through rain, sleet, hail, high winds and snow. Not to mention the extra complications of an ongoing pandemic! It was also nice that the crew included Ross, the fiancé of ex-herder Ali. They were very good with us, and would always stop work to give us space when we were leading reindeer across the old bridge. Though the orange safety netting was definitely an entertaining obstacle when leading antlered animals! The second national lockdown from Christmas brought work to a halt for a while, but in March a helicopter lifted out the old bridge, and our twin bridges were down to one sturdy, hopefully long-lasting, shiny new bridge.

New supports in place.
Slioch keeping an eye on progress as we cross the old bridge. The orange safety fencing was… entertaining… when passing close by with pointy antlers…
The framework for the new bridge complete.
The wintry Cairngorms weather didn’t help matters!
The final wooden structure being built on the metal framework.
Nearly there, just the steps and finishing touches to go.

Not wanting to lose a piece of the Reindeer Company history, Alan drove a tractor and trailer all the way from our hill farm to collect the old dismantled bridge. Apparently the old steel girders were of a quality that is impossible to buy these days! There is a plan to reinstate the old bridge at a suitable location at the farm.

The helicopter at the Sugarbowl after lifting out the old bridge in sections – the giant metal girders are just visible in the background.
The shiny new bridge in use with the last of the old bridge being dismantled.

It has taken the reindeer a bit of time to get used to the new crossing – the steps were perhaps not quite designed for reindeer strides – but once they’ve been over it once or twice they get the hang of it. It’s great having the edging alongside the steps to guide them in the right direction – the old bridge was rather awkward as the steps didn’t have a rail on each side, so calves would sometimes “miss”! And with the new ample width, we’re still debating if we can be bothered carrying one of our Christmas sleighs down the narrow path to get a photo of a full team of reindeer in sleigh on the bridge – it would fit!

Sherlock testing out the new bridge.

Andi

Book Now